Project management for engineering and construction / (Record no. 8871)

000 -LEADER
fixed length control field 09916cam a2200541 i 4500
001 - CONTROL NUMBER
control field u12136
003 - CONTROL NUMBER IDENTIFIER
control field SA-PMU
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20210418124628.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 131204t20142014nyua b 001 0 eng c
040 ## - CATALOGING SOURCE
Original cataloging agency YDXCP
Language of cataloging eng
Description conventions rda
Transcribing agency YDXCP
Modifying agency BTCTA
-- IPL
-- OKS
-- OCLCQ
-- OCLCF
-- TOH
-- BDX
-- N5L
-- MYIIU
-- SFR
019 ## -
-- 892060090
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 0071822313
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780071822312
035 ## - SYSTEM CONTROL NUMBER
System control number (OCoLC)864700493
Canceled/invalid control number (OCoLC)892060090
037 ## - SOURCE OF ACQUISITION
Source of stock number/acquisition McGraw-Hill, Customer Service Po Box 545, Blacklick, OH, USA, 43004
Note SAN 200-254X
042 ## - AUTHENTICATION CODE
Authentication code pcc
050 #4 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TA190
Item number .O24 2014
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 620.0068/4
Edition number 23
029 1# - OTHER SYSTEM CONTROL NUMBER (OCLC)
OCLC library identifier AU@
System control number 000053548273
029 1# - OTHER SYSTEM CONTROL NUMBER (OCLC)
OCLC library identifier NZ1
System control number 15649147
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Oberlender, Garold D.,
Relator term author.
245 10 - TITLE STATEMENT
Title Project management for engineering and construction /
Statement of responsibility, etc. Garold D. Oberlender, Ph. D., P.E., Professor Emeritus of Civil Engineering, Oklahoma State University.
250 ## - EDITION STATEMENT
Edition statement Third edition.
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture New York :
Name of producer, publisher, distributor, manufacturer Mcgraw-Hill Education,
Date of production, publication, distribution, manufacture, or copyright notice [2014]
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice ©2014
300 ## - PHYSICAL DESCRIPTION
Extent xii, 420 pages :
Other physical details illustrations ;
Dimensions 24 cm
336 ## - CONTENT TYPE
Content type term text
Content type code txt
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Media type code n
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Carrier type code nc
Source rdacarrier
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and index.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note A. About the author -- B. Preface -- 1. Introduction -- Purpose of this book -- Arrangement of this book -- Definition of a project -- Ensuring quality in a project -- Responsibilities of parties -- Who does the project manager work for? -- Purpose of project management -- Types of management -- Functions of management -- Key concepts of project management -- Role of the project manager -- Professional and technical organizations -- References -- 2. Working with project teams -- Project teams -- Teamwork -- Teams for small projects -- Working with multiple teams -- Owner's team -- Design teams -- Construction teams -- Team management -- Teams and the project manager's responsibilities -- Key factors in team leadership -- Team building -- Motivating teams -- Conflict management -- Developing a consensus -- Team conduct -- References -- 3. Project initiation -- Design and construction process -- Advances in the engineering and construction process -- Private versus public projects -- Contractual arrangements -- Phases of a project -- Owner's study -- Owner's needs and project objectives -- Project scope definition -- Project strategy -- Selection of design firms and construction contractors -- Partnering -- References -- 4. Early estimates -- Importance of early estimates -- Importance of estimator -- Classification of early estimates -- Estimating work process -- Importance of team alignment in preparing early estimates -- Scope definition and early estimates -- Preparing early estimates -- Organizing to prepare estimates -- Establishing an estimate work plan -- Methods and techniques -- Estimate checklists -- Estimate documentation -- Estimate reviews -- Risk assessment -- Risk analysis -- Contingency -- Traditional methods of assigning contingency -- Estimate feedback for continuous improvement -- References
505 8# - FORMATTED CONTENTS NOTE
Formatted contents note 5. Project budgeting -- Project budgets -- Development of project estimates for budgeting -- Levels of accuracy -- Owner's estimate for budgeting -- Weighted unit cost estimating -- Adjustments for time, size, and location -- Parametric estimating -- Economic feasibility study -- Design budgets -- Contractor's bid -- References -- 6. Development of work plan -- Project manager's initial review -- Owner's orientation -- Organizational structures -- Work breakdown structure -- Formats for work breakdown structures -- Forming the project team -- Kick-off meeting -- Work packages -- Follow-up work -- Project work plan -- References -- 7. Design proposals -- Evolution of projects -- Project execution plan -- Project definition -- Problems in developing project definition -- Design proposals -- Engineering organization -- Scope baseline for budget -- Design work package -- Mini-drawings -- Development of the design work plan -- Engineering project controls -- Progress measurement of engineering design -- References -- 8. Project scheduling -- Project planning and project scheduling -- Desired results of planning -- Benefits of planning -- Principles of planning and scheduling -- Responsibilities of parties -- Planning for multiple projects -- Techniques for planning and scheduling -- Network analysis systems -- Development of cpm diagram from the wbs -- Assigning realistic durations -- Computer applications -- Schedule coding system -- Cost distribution -- Resource allocations for design -- Resource allocations for construction -- Calculations to verify schedules and cost distributions -- Program evaluation and review technique (pert) -- Successor/predecessor relationships -- Problems using successor/predecessor relationships -- References
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note 9. Tracking work -- Control systems -- Linking the wbs and cpm -- Coding system for project reports -- Control schedules for time and cost -- Relationships between time and work -- Integrated cost/schedule/work -- Percent complete matrix method -- Progress measurement of design -- Measurement of construction work -- Project measurement and control -- Earned-value system -- Monitoring project performance -- Interpretation of performance indices -- Analysis tree of total float (tf) and schedule performance index (spi) -- Causes of cost/schedule variances -- Trend analysis and forecasting -- Work status system -- References -- 10. Design coordination -- Design work plan -- Common problems in managing design -- Producing contract documents -- Managing scope growth during design -- Managing small projects -- Project team meetings -- Weekly/monthly reports -- Drawing index -- Equipment index -- Distribution of documents -- Authority/responsibility checklist -- Checklist of duties for design -- Team management -- Evaluation of design effectiveness -- Constructability -- Post design review -- References -- 11. Construction phase -- Importance of construction -- Assumptions for construction phase -- Contract pricing formats -- Design/bid/build method of project delivery -- Design/build method of project delivery -- Construction management method of project delivery -- Bridging project delivery method -- Build-operate-transfer -- Fast-track projects -- Turn-key projects -- Design development and performance specifications -- Key decisions for project delivery -- Prospective bidders and bidding
505 8# - FORMATTED CONTENTS NOTE
Formatted contents note Qualification-based selection (qbs) -- Checklist for bidding -- Keys to a successful project -- Construction schedules -- Problems with construction schedules -- Precautions for construction submittals -- Delivery dates of owner-furnished equipment or materials -- Scheduling contractor procured and installed equipment -- Contract schedule constraints -- Sequestering float -- Schedule updates -- Relations with contractors -- Checklist of duties -- Quality control -- Dispute resolutions -- Job-site safety -- Management of changes -- Resource management -- References -- 12. Project close out -- System testing and start-up -- Final inspection -- Guarantee and warranties -- Lien releases -- Record and as-built drawings -- Checklist of duties -- Disposition of project files -- Post project critique -- Owner's feedback -- References -- 13. Personal management skills -- Challenges and opportunities -- Using new innovations -- Human aspects -- Assignment of work -- Motivation -- Decision making -- Time management -- Communications -- Presentations -- Meetings -- Reports and letters -- References -- 14. Risk management -- Introduction -- Risk management process -- Guidelines for risk management process -- Risks of owner, designer, and contractor -- Risk assessment -- Risk analysis -- Risk analysis of costs -- Risk analysis of schedule using pert -- Risk analysis using simulation -- Risk analysis of schedule using simulation -- Risk analysis of costs using simulation -- Mitigation of risk -- Project risk register -- Development of the initial project risk register -- Strategies to mitigate a risk -- Methods to prevent or mitigate risks -- Development of a risk mitigation plan -- References -- A. Appendix: example project -- Statement of work -- Development of project work plan.
520 ## - SUMMARY, ETC.
Summary, etc. The latest, most effective engineering and construction project management strategies. Fully revised throughout, this up-to-date guide presents the principles and techniques of managing engineering and construction projects from the initial conceptual phase, through design and construction, to completion. The book emphasizes project management during the beginning stages of project development to influence the quality, cost, and schedule of a project as early in the process as possible. Featuring an all-new chapter on risk management, the third edition also includes new sections on: Ensuring project quality, The owner's team, Parametric estimating, Importance of the estimator, Formats for work breakdown structures, Design work packages, Benefits of planning, Calculations to verify schedules and cost distributions, Common problems in managing design, Build-operate-transfer delivery methods Based on the author's decades of experience in working with hundreds of project managers, this essential resource includes many new real-world examples and updated sample problems.
596 ## -
-- 1
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Engineering
General subdivision Management.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management.
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Engineering
General subdivision Management.
Source of heading or term fast
Authority record control number or standard number (OCoLC)fst00910368
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management.
Source of heading or term fast
Authority record control number or standard number (OCoLC)fst01078797
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Engineering
General subdivision Management.
938 ## -
-- Baker and Taylor
-- BTCP
-- BK0014140324
938 ## -
-- YBP Library Services
-- YANK
-- 11393436
938 ## -
-- Brodart
-- BROD
-- 108308022
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Books
994 ## -
-- Z0
-- SUPMU
948 ## - LOCAL PROCESSING INFORMATION (OCLC); SERIES PART DESIGNATOR (RLIN)
h (OCLC) NO HOLDINGS IN SUPMU - 82 OTHER HOLDINGS
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type Public note
          Main Library Main Library 04/18/2021   TA190 .O24 2014 51952000322535 04/15/2021 1 04/15/2021 Books STACKS