000 | 01921cam a22003734a 4500 | ||
---|---|---|---|
001 | u8903 | ||
003 | SA-PMU | ||
005 | 20210418124149.0 | ||
008 | 040806s2005 nyua 001 0 eng | ||
010 | _a 2004018452 | ||
040 |
_aDLC _beng _cDLC _dBAKER _dMUQ _dBTCTA _dYDXCP _dWAU _dIG# _dDEBBG _dOH@ _dILU _dBDX _dOCLCF |
||
020 | _a0814472370 | ||
020 | _a9780814472378 | ||
020 | _a8120331273 (cased) | ||
020 | _a9788120331273 (cased) | ||
035 |
_a(OCoLC)56730632 _z(OCoLC)493363216 |
||
042 | _apcc | ||
050 | 0 | 0 |
_aTS183 _b.C36 2005 |
082 | 0 | 0 |
_a658.5 _222 |
100 | 1 | _aCarreira, Bill. | |
245 | 1 | 0 |
_aLean manufacturing that works : _bpowerful tools for dramatically reducing waste and maximizing profits / _cBill Carreir. |
260 |
_aNew York : _bAmerican Management Association, _cc2005. |
||
300 |
_avi, 295 p. : _bill. ; _c26 cm. |
||
500 | _aIncludes index. | ||
505 | 0 | 0 |
_tIntroduction : the why -- _gCh. 1. _tCustomer satisfaction -- _gCh. 2. _tCost and profit -- _gCh. 3. _tMetrics -- _gCh. 4. _tCash flow -- _gCh. 5. _tInventory and carrying cost -- _gCh. 6. _tVelocity, throughput, and lead time -- _gCh. 7. _tBatch and queue vs. lean flow -- _gCh. 8. _tWaste -- _gCh. 9. _tValue added, non-value-added, required non-value-added -- _gCh. 10. _tDoing a baseline -- _gCh. 11. _tDoing a baseline, day 1 -- _gCh. 12. _tDoing a baseline, day 2 -- _gCh. 13. _tDoing a baseline, day 3 -- _gCh. 14. _tDoing a baseline, day 4 -- _gCh. 15. _tDoing a baseline, day 5 -- _gCh. 16. _tLean-engineering analysis -- _gCh. 17. _tSeeking balance -- _gCh. 18. _tThe 5S system -- _gCh. 19. _tSetup reduction -- _gCh. 20. _tTotal productive maintenance (TPM) |
650 | 0 | _aManufacturing processes. | |
650 | 0 | _aProduction planning. | |
650 | 0 | _aProcess control. | |
650 | 0 | _aLean manufacturing. | |
856 | 4 | 1 |
_3Table of contents _uhttp://catdir.loc.gov/catdir/toc/ecip0421/2004018452.html |
942 | _cBOOK | ||
994 |
_aZ0 _bSUPMU |
||
596 | _a1 2 | ||
999 |
_c6530 _d6530 |