| 000 | 03903cam a2200337 a 4500 | ||
|---|---|---|---|
| 001 | u3299 | ||
| 003 | SA-PMU | ||
| 005 | 20210418124643.0 | ||
| 007 | co |g||||||||| | ||
| 008 | 080620s2009 nyua b 001 0 eng | ||
| 010 | _a 2008027686 | ||
| 040 |
_aDLC _beng _cDLC _dYDX _dBTCTA _dYDXCP _dCDX _dGA0 _dTSU _dOUP _dOCLCQ |
||
| 020 | _a9780521515221 (hardback) | ||
| 020 | _a052151522X (hardback) | ||
| 035 | _a(OCoLC)232605749 | ||
| 050 | 0 | 0 |
_aTA169 _b.C45 2009 |
| 082 | 0 | 0 |
_a620/.00452 _222 |
| 100 | 1 |
_aChandrupatla, Tirupathi R., _d1944- |
|
| 245 | 1 | 0 |
_aQuality and reliability in engineering / _cTirupathi R. Chandrupatla. |
| 260 |
_aNew York : _bCambridge University Press, _c2009. |
||
| 300 |
_axv, 309 p. : _bill. ; _c24 cm. + _e1 CD-ROM (4 3/4 in.) |
||
| 504 | _aIncludes bibliographical references (p. 301-304) and index. | ||
| 505 | 0 | _aQuality Concepts -- Introduction -- Quality and reliability defined -- Historical development -- Quality philosophies -- Conclusion -- QUESTIONS FOR DISCUSSION -- Tolerances and Fits -- Introduction -- Preferred numbers -- Tolerances and fits -- Manufacturing processes and tolerances -- Tolerance selection in assemblies -- Summary -- EXERCISE PROBLEMS -- Geometric Tolerances -- Introduction -- Geometric tolerances -- some basic ideas -- Tolerances of form -- Profile tolerances -- Orientation tolerances -- Tolerances of location -- Tolerances of runout -- Summary -- EXERCISE PROBLEMS -- Elements of Probability and Statistics -- Introduction -- Probability -- Statistics -- Probability distribution definitions -- Discrete probability distributions -- Continuous distributions -- Summary -- EXERCISE PROBLEMS -- Sampling Concepts -- Introduction -- The central limit theorem -- Confidence interval estimation -- Confidence interval for the mean of a normal population -- Confidence interval for the difference between two means -- Confidence interval for a proportion -- Confidence interval for the variance -- Confidence interval for the ratio of two variances -- Hypothesis testing -- Type I and Type II errors -- Sample size determination -- Summary -- EXERCISE PROBLEMS -- Data Presentation: Graphs and Charts -- Introduction -- Stem-and-leaf plots -- Histograms -- Cause-and-effect diagrams -- Pareto charts -- Box plots -- Normal probability plot -- Run charts -- Summary -- EXERCISE PROBLEMS. | |
| 505 | 0 | _aStatistical Process Control -- Introduction -- Order statistics and other preliminaries -- Causes of variation -- Statistical process control concepts -- Control charts for variables -- Control charts for attributes -- Operating characteristic (OC) curves -- Summary -- EXERCISE PROBLEMS -- Process Capability Analysis -- Introduction -- Process capability -- Measurement system analysis -- gage repeatability and reproducibility study -- Propagation of errors -- Prediction and tolerance intervals for normal distribution -- Summary -- EXERCISE PROBLEMS -- Acceptance Sampling -- Introduction -- Acceptance sampling for attributes -- Sampling plans for variables -- Summary -- EXERCISE PROBLEMS -- Experimental Design -- Introduction -- Basic concepts -- Factorial experiments -- 2k factorial experiments -- Summary -- EXERCISE PROBLEMS -- Reliability Concepts -- Introduction -- Reliability functions -- Failure distributions -- System reliability -- K-of-N systems -- Standby systems -- Summary -- EXERCISE PROBLEMS -- Reliability Testing -- Introduction -- Weibull distribution parameter estimation -- Lognormal distribution parameter estimation -- Exponential-based life testing and confidence intervals -- Sampling procedures for life testing (exponential-based) --Summary -- EXERCISE PROBLEMS. | |
| 650 | 0 | _aReliability (Engineering) | |
| 650 | 0 | _aQuality assurance. | |
| 856 | 4 | 1 |
_3Table of contents only _uhttp://catdir.loc.gov/catdir/toc/fy0903/2008027686.html |
| 942 | _cBOOK | ||
| 994 |
_aZ0 _bSUPMU |
||
| 596 | _a1 2 | ||
| 999 |
_c8989 _d8989 |
||